{"id":6656,"date":"2025-09-05T22:14:56","date_gmt":"2025-09-05T22:14:56","guid":{"rendered":"https:\/\/search.insightful.design\/?p=6656"},"modified":"2025-09-05T22:14:56","modified_gmt":"2025-09-05T22:14:56","slug":"update-boulder-county-receives-grant-for-electric-vehicle-charging-infrastructure-2026-3","status":"publish","type":"post","link":"https:\/\/search.insightful.design\/?p=6656","title":{"rendered":"Update: Boulder County Receives Grant for Electric Vehicle Charging Infrastructure (2026)"},"content":{"rendered":"<h2>Update: Boulder County Receives Grant for Electric Vehicle Charging Infrastructure (2026)<\/h2>\n<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n<p>The Superior Senior Center offers related programming including free legal consultations, tax preparation assistance, health screenings, and social activities. Over 1,584 seniors participated in center programs last year.<\/p>\n<p>Safety data from the Superior area shows 11 reported incidents in the past 12 months, a 22% change from the previous year. The Sheriff&#8217;s Office has increased patrols along Flagstaff Road and added community outreach programs in response to resident feedback.<\/p>\n<h3>Background<\/h3>\n<p>The project includes improvements along Flagstaff Road between Superior and the intersection with Arapahoe Road. Construction is scheduled to begin in September 2026 with completion expected within 16 months.<\/p>\n<p>The application deadline is July 3, 2026. Late applications will be accepted on a space-available basis. Incomplete applications will be returned with a list of missing items. Average review time is 18 business days.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[13,12,14],"class_list":["post-6656","post","type-post","status-publish","format-standard","hentry","category-environment-sustainability","tag-boulder-county","tag-demo-data","tag-news"],"_links":{"self":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/6656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6656"}],"version-history":[{"count":0,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/6656\/revisions"}],"wp:attachment":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}