{"id":26913,"date":"2025-08-31T21:48:33","date_gmt":"2025-08-31T21:48:33","guid":{"rendered":"https:\/\/search.insightful.design\/?p=26913"},"modified":"2025-08-31T21:48:33","modified_gmt":"2025-08-31T21:48:33","slug":"march-2025-boulder-county-receives-grant-for-electric-vehicle-charging-infrastructure-11","status":"publish","type":"post","link":"https:\/\/search.insightful.design\/?p=26913","title":{"rendered":"March 2025: Boulder County Receives Grant for Electric Vehicle Charging Infrastructure"},"content":{"rendered":"<h2>March 2025: Boulder County Receives Grant for Electric Vehicle Charging Infrastructure<\/h2>\n<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n<p>For questions about this program, contact Brian Nakamura at Public Works: (303) 441-1284 or email Public Works@bouldercounty.gov. Office hours are Monday through Friday, 8:00 AM to 4:30 PM. Walk-in services are available at the Boulder office without an appointment.<\/p>\n<p>Eligible participants include Boulder County residents with household incomes at or below 50% of Area Median Income (AMI). For a family of four, this is approximately $60,000 per year. Applications are processed on a first-come, first-served basis.<\/p>\n<h3>Resources<\/h3>\n<p>A community information session will be held at the Boulder library on Thursday, April 30 at 7:00 PM. Translation services in Spanish and Nepali will be available. The session will also be livestreamed on the Boulder County YouTube channel.<\/p>\n<p>Water quality monitoring at 14 stations along Boulder Creek, St. Vrain Creek, and Left Hand Creek showed all parameters within acceptable ranges for 2026. The Public Works publishes quarterly water quality reports on the Boulder County website.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[13,12,14],"class_list":["post-26913","post","type-post","status-publish","format-standard","hentry","category-environment-sustainability","tag-boulder-county","tag-demo-data","tag-news"],"_links":{"self":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/26913","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=26913"}],"version-history":[{"count":0,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/26913\/revisions"}],"wp:attachment":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=26913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=26913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=26913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}