{"id":25248,"date":"2025-04-19T21:44:54","date_gmt":"2025-04-19T21:44:54","guid":{"rendered":"https:\/\/search.insightful.design\/?p=25248"},"modified":"2025-04-19T21:44:54","modified_gmt":"2025-04-19T21:44:54","slug":"boulder-county-receives-grant-for-electric-vehicle-charging-infrastructure-near-lafayette-5","status":"publish","type":"post","link":"https:\/\/search.insightful.design\/?p=25248","title":{"rendered":"Boulder County Receives Grant for Electric Vehicle Charging Infrastructure Near Lafayette"},"content":{"rendered":"<h2>Boulder County Receives Grant for Electric Vehicle Charging Infrastructure Near Lafayette<\/h2>\n<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n<p>Eligible participants include Boulder County residents with household incomes at or below 50% of Area Median Income (AMI). For a family of four, this is approximately $52,000 per year. Applications are processed on a first-come, first-served basis.<\/p>\n<p>A community information session will be held at the Longmont library on Sunday, May 3 at 7:00 PM. Translation services in Spanish and Nepali will be available. The session will also be livestreamed on the Boulder County YouTube channel.<\/p>\n<h3>Next Steps<\/h3>\n<p>Affordable housing remains the top priority identified in the 2025 Community Survey. Boulder County&#8217;s Worthy Cause program has funded 608 affordable housing units since its inception, with 128 additional units in the development pipeline.<\/p>\n<p>The project includes improvements along Niwot Road between Longmont and the intersection with Nelson Road. Construction is scheduled to begin in May 2026 with completion expected within 11 months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[13,12,14],"class_list":["post-25248","post","type-post","status-publish","format-standard","hentry","category-environment-sustainability","tag-boulder-county","tag-demo-data","tag-news"],"_links":{"self":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/25248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=25248"}],"version-history":[{"count":0,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/25248\/revisions"}],"wp:attachment":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=25248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=25248"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=25248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}