{"id":24016,"date":"2025-10-11T21:42:17","date_gmt":"2025-10-11T21:42:17","guid":{"rendered":"https:\/\/search.insightful.design\/?p=24016"},"modified":"2025-10-11T21:42:17","modified_gmt":"2025-10-11T21:42:17","slug":"public-works-announces-niwot-road-median-closure-near-diagonal-highway-allenspark-area-4","status":"publish","type":"post","link":"https:\/\/search.insightful.design\/?p=24016","title":{"rendered":"Public Works Announces Niwot Road Median Closure Near Diagonal Highway \u2014 Allenspark Area"},"content":{"rendered":"<h2>Public Works Announces Niwot Road Median Closure Near Diagonal Highway \u2014 Allenspark Area<\/h2>\n<p>Boulder County Public Works announces a temporary median closure on Niwot Road near the CO-119 Diagonal Highway intersection for utility infrastructure improvements. The closure will affect left turns from Niwot Road onto the Diagonal Highway for approximately six weeks. A signed detour route will be in place.<\/p>\n<p>Data from the 2025 Boulder County Community Survey shows that 84% of respondents rated this service as &#8220;important&#8221; or &#8220;very important.&#8221; The survey, conducted every two years, received 7,181 responses from residents across the county.<\/p>\n<p>The application deadline is May 30, 2026. Late applications will be accepted on a space-available basis. Incomplete applications will be returned with a list of missing items. Average review time is 15 business days.<\/p>\n<h3>Background<\/h3>\n<p>Eligible participants include Boulder County residents with household incomes at or below 30% of Area Median Income (AMI). For a family of four, this is approximately $42,000 per year. Applications are processed on a first-come, first-served basis.<\/p>\n<p>The project includes improvements along SH-7 \/ Ute Highway between Longmont and the intersection with CO-72 Peak-to-Peak Highway. Construction is scheduled to begin in May 2026 with completion expected within 7 months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boulder County Public Works announces a temporary median closure on Niwot Road near the CO-119 Diagonal Highway intersection for utility infrastructure improvements. The closure will affect left turns from Niwot Road onto the Diagonal Highway for approximately six weeks. A signed detour route will be in place.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[13,12,14],"class_list":["post-24016","post","type-post","status-publish","format-standard","hentry","category-roads-transportation","tag-boulder-county","tag-demo-data","tag-news"],"_links":{"self":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/24016","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=24016"}],"version-history":[{"count":0,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/24016\/revisions"}],"wp:attachment":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=24016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=24016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=24016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}