{"id":23114,"date":"2025-06-21T21:40:21","date_gmt":"2025-06-21T21:40:21","guid":{"rendered":"https:\/\/search.insightful.design\/?p=23114"},"modified":"2025-06-21T21:40:21","modified_gmt":"2025-06-21T21:40:21","slug":"boulder-canyon-trail-closure-due-to-rockfall-mitigation-work-april-2024-10","status":"publish","type":"post","link":"https:\/\/search.insightful.design\/?p=23114","title":{"rendered":"Boulder Canyon Trail Closure Due to Rockfall Mitigation Work \u2014 April 2024"},"content":{"rendered":"<h2>Boulder Canyon Trail Closure Due to Rockfall Mitigation Work \u2014 April 2024<\/h2>\n<p>Boulder County Parks &#038; Open Space announces a temporary closure of the Boulder Canyon Trail between Elephant Buttresses and the Dome trailhead for rockfall mitigation work. Crews will be scaling loose rock and installing mesh netting along a 400-foot section of cliff face above the trail. The closure is expected to last approximately three weeks, weather permitting.<\/p>\n<p>The application deadline is July 24, 2026. Late applications will be accepted on a space-available basis. Incomplete applications will be returned with a list of missing items. Average review time is 20 business days.<\/p>\n<p>Volunteers contributed over 3,699 hours to this program last year. The Community Planning &#038; Permitting coordinates with 10 nonprofit partner organizations throughout Boulder County to deliver services.<\/p>\n<h3>Contact Information<\/h3>\n<p>The project includes improvements along Foothills Highway between Superior and the intersection with SH-7 \/ Ute Highway. Construction is scheduled to begin in June 2026 with completion expected within 18 months.<\/p>\n<p>Public comment on this matter can be submitted through the Boulder County online portal, by email to Community Planning &#038; Permitting, or in person at the next Board of County Commissioners meeting. Written comments received by 5:00 PM the day before the hearing will be included in the public record.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boulder County Parks &#038; Open Space announces a temporary closure of the Boulder Canyon Trail between Elephant Buttresses and the Dome trailhead for rockfall mitigation work. Crews will be scaling loose rock and installing mesh netting along a 400-foot section of cliff face above the trail. The closure is expected to last approximately three weeks, weather permitting.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[13,12,14],"class_list":["post-23114","post","type-post","status-publish","format-standard","hentry","category-open-space-recreation","tag-boulder-county","tag-demo-data","tag-news"],"_links":{"self":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/23114","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23114"}],"version-history":[{"count":0,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/23114\/revisions"}],"wp:attachment":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23114"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23114"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23114"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}