{"id":2155,"date":"2025-08-30T22:10:41","date_gmt":"2025-08-30T22:10:41","guid":{"rendered":"https:\/\/search.insightful.design\/?p=2155"},"modified":"2025-08-30T22:10:41","modified_gmt":"2025-08-30T22:10:41","slug":"update-boulder-county-receives-grant-for-electric-vehicle-charging-infrastructure-2025-2","status":"publish","type":"post","link":"https:\/\/search.insightful.design\/?p=2155","title":{"rendered":"Update: Boulder County Receives Grant for Electric Vehicle Charging Infrastructure (2025)"},"content":{"rendered":"<h2>Update: Boulder County Receives Grant for Electric Vehicle Charging Infrastructure (2025)<\/h2>\n<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n<p>Environmental review of the project area near Sunshine Canyon Drive found 9 sensitive species and 3 wetland areas requiring mitigation. The Community Planning &#038; Permitting worked with Colorado Parks and Wildlife to develop a habitat conservation plan.<\/p>\n<p>The Boulder Senior Center offers related programming including free legal consultations, tax preparation assistance, health screenings, and social activities. Over 1,865 seniors participated in center programs last year.<\/p>\n<h3>Related Programs<\/h3>\n<p>Public comment on this matter can be submitted through the Boulder County online portal, by email to Community Planning &#038; Permitting, or in person at the next Board of County Commissioners meeting. Written comments received by 5:00 PM the day before the hearing will be included in the public record.<\/p>\n<p>Water quality monitoring at 10 stations along Boulder Creek, St. Vrain Creek, and Left Hand Creek showed all parameters within acceptable ranges for 2024. The Community Planning &#038; Permitting publishes quarterly water quality reports on the Boulder County website.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[13,12,14],"class_list":["post-2155","post","type-post","status-publish","format-standard","hentry","category-environment-sustainability","tag-boulder-county","tag-demo-data","tag-news"],"_links":{"self":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/2155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2155"}],"version-history":[{"count":0,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/2155\/revisions"}],"wp:attachment":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}