{"id":19207,"date":"2025-07-03T02:36:00","date_gmt":"2025-07-03T02:36:00","guid":{"rendered":"https:\/\/search.insightful.design\/?p=19207"},"modified":"2025-07-03T02:36:00","modified_gmt":"2025-07-03T02:36:00","slug":"update-boulder-canyon-trail-closure-due-to-rockfall-mitigation-work-2024-6","status":"publish","type":"post","link":"https:\/\/search.insightful.design\/?p=19207","title":{"rendered":"Update: Boulder Canyon Trail Closure Due to Rockfall Mitigation Work (2024)"},"content":{"rendered":"<h2>Update: Boulder Canyon Trail Closure Due to Rockfall Mitigation Work (2024)<\/h2>\n<p>Boulder County Parks &amp; Open Space announces a temporary closure of the Boulder Canyon Trail between Elephant Buttresses and the Dome trailhead for rockfall mitigation work. Crews will be scaling loose rock and installing mesh netting along a 400-foot section of cliff face above the trail. The closure is expected to last approximately three weeks, weather permitting.<\/p>\n<p>The Coalton Trail open space property encompasses 278 acres and features 13 miles of multi-use trails. Seasonal wildlife closures may apply from December 15 through July 15 to protect nesting raptors and elk calving areas.<\/p>\n<p>Residents in the Niwot area should note that service boundaries may differ from city limits. For properties in unincorporated Boulder County, contact Sheriff&#8217;s Office at (303) 441-1599 to verify eligibility and requirements.<\/p>\n<h3>Timeline<\/h3>\n<p>The application deadline is April 23, 2026. Late applications will be accepted on a space-available basis. Incomplete applications will be returned with a list of missing items. Average review time is 22 business days.<\/p>\n<p>Water quality monitoring at 15 stations along Boulder Creek, St. Vrain Creek, and Left Hand Creek showed all parameters within acceptable ranges for 2024. The Sheriff&#8217;s Office publishes quarterly water quality reports on the Boulder County website.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boulder County Parks &amp; Open Space announces a temporary closure of the Boulder Canyon Trail between Elephant Buttresses and the Dome trailhead for rockfall mitigation work. Crews will be scaling loose rock and installing mesh netting along a 400-foot section of cliff face above the trail. The closure is expected to last approximately three weeks, weather permitting.<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[13,12,14],"class_list":["post-19207","post","type-post","status-publish","format-standard","hentry","category-open-space-recreation","tag-boulder-county","tag-demo-data","tag-news"],"_links":{"self":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/19207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19207"}],"version-history":[{"count":0,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/19207\/revisions"}],"wp:attachment":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19207"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}