{"id":18233,"date":"2025-07-17T02:33:55","date_gmt":"2025-07-17T02:33:55","guid":{"rendered":"https:\/\/search.insightful.design\/?p=18233"},"modified":"2025-07-17T02:33:55","modified_gmt":"2025-07-17T02:33:55","slug":"update-boulder-county-receives-grant-for-electric-vehicle-charging-infrastructure-2024-9","status":"publish","type":"post","link":"https:\/\/search.insightful.design\/?p=18233","title":{"rendered":"Update: Boulder County Receives Grant for Electric Vehicle Charging Infrastructure (2024)"},"content":{"rendered":"<h2>Update: Boulder County Receives Grant for Electric Vehicle Charging Infrastructure (2024)<\/h2>\n<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n<p>Eligible participants include Boulder County residents with household incomes at or below 80% of Area Median Income (AMI). For a family of four, this is approximately $120,000 per year. Applications are processed on a first-come, first-served basis.<\/p>\n<p>The program is modeled after similar successful initiatives in Larimer County and Jefferson County. Boulder County&#8217;s version includes additional provisions for wildfire mitigation, affordable housing, and environmental sustainability.<\/p>\n<h3>Next Steps<\/h3>\n<p>Historical context: Boulder County was established in 1861 and covers 741 square miles of diverse terrain from the Great Plains to the Continental Divide. The county&#8217;s population of approximately 330,000 residents is served by 2230 county employees across 36 departments and offices.<\/p>\n<p>The application deadline is May 23, 2026. Late applications will be accepted on a space-available basis. Incomplete applications will be returned with a list of missing items. Average review time is 15 business days.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[13,12,14],"class_list":["post-18233","post","type-post","status-publish","format-standard","hentry","category-environment-sustainability","tag-boulder-county","tag-demo-data","tag-news"],"_links":{"self":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/18233","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18233"}],"version-history":[{"count":0,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/18233\/revisions"}],"wp:attachment":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18233"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18233"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18233"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}