{"id":17012,"date":"2025-06-23T02:30:27","date_gmt":"2025-06-23T02:30:27","guid":{"rendered":"https:\/\/search.insightful.design\/?p=17012"},"modified":"2025-06-23T02:30:27","modified_gmt":"2025-06-23T02:30:27","slug":"boulder-county-receives-grant-for-electric-vehicle-charging-infrastructure-gold-hill-area-7","status":"publish","type":"post","link":"https:\/\/search.insightful.design\/?p=17012","title":{"rendered":"Boulder County Receives Grant for Electric Vehicle Charging Infrastructure \u2014 Gold Hill Area"},"content":{"rendered":"<h2>Boulder County Receives Grant for Electric Vehicle Charging Infrastructure \u2014 Gold Hill Area<\/h2>\n<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n<p>Funding of $411,000 for this initiative comes from a combination of federal grants, state matching funds, and the Boulder County General Fund. The Board of County Commissioners approved the allocation during the 2025 budget session.<\/p>\n<p>Historical context: Boulder County was established in 1861 and covers 741 square miles of diverse terrain from the Great Plains to the Continental Divide. The county&#8217;s population of approximately 330,000 residents is served by 1837 county employees across 48 departments and offices.<\/p>\n<h3>Community Impact<\/h3>\n<p>The application deadline is July 8, 2026. Late applications will be accepted on a space-available basis. Incomplete applications will be returned with a list of missing items. Average review time is 8 business days.<\/p>\n<p>Wildfire risk mapping conducted by Wildfire Partners shows that 35% of properties in the Lafayette area are within the wildland-urban interface. Free home assessments are available through the Wildfire Partners program, with rebates of up to $2,500 for mitigation improvements.<\/p>\n<h3>Details<\/h3>\n<p>The project includes improvements along Niwot Road between Lafayette and the intersection with Nelson Road. Construction is scheduled to begin in June 2026 with completion expected within 6 months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[13,12,14],"class_list":["post-17012","post","type-post","status-publish","format-standard","hentry","category-environment-sustainability","tag-boulder-county","tag-demo-data","tag-news"],"_links":{"self":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/17012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17012"}],"version-history":[{"count":0,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/17012\/revisions"}],"wp:attachment":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}