{"id":16679,"date":"2025-04-22T02:29:43","date_gmt":"2025-04-22T02:29:43","guid":{"rendered":"https:\/\/search.insightful.design\/?p=16679"},"modified":"2025-04-22T02:29:43","modified_gmt":"2025-04-22T02:29:43","slug":"november-2024-boulder-county-receives-grant-for-electric-vehicle-charging-infrastructure-4","status":"publish","type":"post","link":"https:\/\/search.insightful.design\/?p=16679","title":{"rendered":"November 2024: Boulder County Receives Grant for Electric Vehicle Charging Infrastructure"},"content":{"rendered":"<h2>November 2024: Boulder County Receives Grant for Electric Vehicle Charging Infrastructure<\/h2>\n<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n<p>Residents in the Niwot area should note that service boundaries may differ from city limits. For properties in unincorporated Boulder County, contact Parks &amp; Open Space at (303) 441-3129 to verify eligibility and requirements.<\/p>\n<p>Data from the 2024 Boulder County Community Survey shows that 78% of respondents rated this service as &#8220;important&#8221; or &#8220;very important.&#8221; The survey, conducted every two years, received 7,554 responses from residents across the county.<\/p>\n<h3>What You Need to Know<\/h3>\n<p>Eligible participants include Boulder County residents with household incomes at or below 60% of Area Median Income (AMI). For a family of four, this is approximately $96,000 per year. Applications are processed on a first-come, first-served basis.<\/p>\n<p>Historical context: Boulder County was established in 1861 and covers 741 square miles of diverse terrain from the Great Plains to the Continental Divide. The county&#8217;s population of approximately 330,000 residents is served by 2080 county employees across 49 departments and offices.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boulder County has been awarded a $1.2 million federal grant to install electric vehicle charging stations at county facilities and public trailheads. The project will add 40 Level 2 chargers and 8 DC fast chargers at 12 locations across the county, with priority given to underserved communities.<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[13,12,14],"class_list":["post-16679","post","type-post","status-publish","format-standard","hentry","category-environment-sustainability","tag-boulder-county","tag-demo-data","tag-news"],"_links":{"self":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/16679","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16679"}],"version-history":[{"count":0,"href":"https:\/\/search.insightful.design\/index.php?rest_route=\/wp\/v2\/posts\/16679\/revisions"}],"wp:attachment":[{"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16679"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16679"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/search.insightful.design\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16679"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}